— MEP BIM Services

One engagement. Every phase. No gaps.

ALP covers MEP modeling, system coordination, and clash resolution under a single scope — from design development through construction documentation, with no context lost between phases.

Colleagues collaborate while examining computer designs.
Colleagues collaborate while examining computer designs.
/ Full Scope Breakdown

What end-to-end ownership covers

MEP Modeling
Clash Resolution
Model Management

Precise system modeling, every trade

Clashes found before they hit the field

Consistent model integrity, phase to phase

Systematic clash detection checked against real-world installation constraints — not just software tolerances. Every conflict logged, assigned, and resolved before it reaches the construction document set.

Mechanical, electrical, and plumbing systems modeled to LOD standards, fully coordinated within the architectural and structural envelope from the first drawing set.

Model ownership stays with ALP from design development through CD delivery. No re-briefing between phases, no version drift, no handoff gaps that create rework downstream.

Real-world constraints, not software defaults

ALP checks every deliverable against installation clearances, access requirements, and trade sequencing — the conditions that software clash detection alone cannot catch.

Fifteen years of project experience means the model reflects how systems actually get built, not just how they render on screen.

+ How We Work

One continuous thread from kickoff to delivery

Phase 01
Phase 02
Phase 03
Phase 04

Design Development

System Coordination

Clash Detection and Resolution

CD Model Delivery

The construction document model is delivered with full LOD compliance, coordination sign-off, and a complete clash report — ready for the field without further interpretation.

ALP enters at project kickoff, establishing model standards, trade extents, and coordination protocols before the first element is placed.

Mechanical, electrical, and plumbing trades are modeled and coordinated simultaneously — no waiting for one trade to finish before the next begins.

Every conflict is logged, assigned, and tracked to closure. Nothing passes to the next phase until the model is clean against real installation tolerances.

Ready to hand off the BIM burden?

Tell us the project scope and phase. ALP will map out exactly where we take over, what we deliver, and when — before any contract is signed.